Cabins 11, 15 and 18, are the last three new cabins to be completed in the girls area and are moving along well! The ceilings are up, the insulation is in and now work continues on the interior paneling and the flooring. We are planning to have these cabins complete, with the exception of some painting and trim work by the end of April.
 
We still need your help! If you can join us here at camp on either March 16th or 23rd to help with the interior work and outside siding, please contact Larry Thompson as soon as possible at [email protected]